• Rainier Middle School Facility Data

     
    Site Size (Acres)25.54
    Building Site (OSPI Square Feet)90,947
    Date of Original Construction 1991
     
     
    RAINIER MIDDLE SCHOOL FREEZE PROTECTION PLAN 2015 - MAINTENANCE TASK LIST
       
    Site Shop Task Description
    RAFS003 Dry drain - above ceiling, Rm 408.
    RAFS003 Dry drain - above tile, Rm (N of entry).
    RAFS003 Dry drain - above tile, Rm (S of entry).
    RAFS003 Dry drain - cat walk, S end 400 hall.
    RAFS003 Dry drain - cust Rm (500 hall).
    RAFS003 Dry drain - main drain.