• Auburn High School Facility Data

     
    Site Size (Acres)19.34
    Building Site (OSPI Square Feet)279,293
    Date of Original Construction 1950
     
     
    AUBURN HIGH SCHOOL FREEZE PROTECTION PLAN 2015 - MAINTENANCE TASK LIST
       
    Site Shop Task Description
    AU Electrical Shop & Custodial Services Check the heat tape on the fire protection pipe above the main entry to school.
    AU  Electrical Shop & Custodial Services Check the heat tape on the exposed piping of chiller one and two for proper operation.
    AU  Electrical Shop & Custodial Services Check the heat tape on the domestic water pipe between the home EC rooms.
    AHFS003 Dry drain - NE side of covered storage (Rm 814).
    AHFS003   Dry drain - SW side of covered storage (Rm 814).
    AHFS003 Dry drain - W side of covered storage (Rm 814).
    AHFS003   Dry drain - Riser Dry Drain (Cup Style).