Timeline: 2020

Plan: Dick Scobee is being rebuilt on the existing site. Students will attend Olympic as an interim facility for one year while the existing school is razed and rebuilt. NAC architecture was selected to design and administer construction of Dick Scobee. Construction is underway on the new school.
 