Terminal Park Elementary

Front of Terminal Park Elementary Drone Shot Web Banner

Timeline: Opened September 2023

The Project: Terminal Park was rebuilt on the existing site. Students attended Olympic as an interim facility for one year while the existing school was razed and rebuilt. NAC Architecture was selected to design and administer construction of Terminal Park.
 

 
 Visit Terminal Park Site Progress for additional photos and videos.
 
Terminal Park Front of Building
 
Ribbon Cutting at Grand Opening for Terminal Park
 
Terminal Park Library pc: Seattle DJC.com
 
Terminal Park Sign in Front of School