Pioneer Elementary
Timeline: Opened Fall 2021
The Project: Pioneer was razed and rebuilt on the existing site. The new school opened in the fall of 2021. Students attended the old Olympic as an interim site during the 20-21 school year.
Visit Pioneer Site Progress for additional photos and videos.