Terminal Park Elementary

Timeline: 2023

Plan: Terminal Park will be rebuilt on the existing site. Students will attend Olympic as an interim facility for one year while the existing school is razed and rebuilt. NAC Architecture was selected to design and administer construction of Terminal Park.